One lane of the Manawatu Gorge Road was reopened on Sunday, 10 days after being blocked by a large slip.
The Transport Agency says the lane will be managed by stop and go signs and the road will be fully reopened within the next two days.
One lane of the Manawatu Gorge Road was reopened on Sunday, 10 days after being blocked by a large slip.
The Transport Agency says the lane will be managed by stop and go signs and the road will be fully reopened within the next two days.