30 Nov 2011

Engineer challenged over ethcial obligation to PGC tenants

From Checkpoint, 5:17 pm on 30 November 2011

An engineer who gave the all-clear to the Pine Gould building after the September earthquake, has been challenged over whether he fulfilled his ethical obligations to those returning to the building.