27 Nov 2014

Kiwirail poor design and human error led to system failure

From Checkpoint, 5:44 pm on 27 November 2014

Kiwirail has admitted its own poor design and human error led to Auckland's trains grinding to a halt back in 2012, stranding thousand of rush hour commuters.